Project : 400 KV Bus Sectionalisation at NTPC - Ramagundam
through AREVA - T & D Systems - Noida.
We are glad to inform you
about our association with Installation, Testing &
Commissioning of prestigious pilot project of 400 KV Bus
Sectionalisation Project (making 2 buses to 4 ) comprises the
following:
1. CVT's - 6 Nos. for
Bifurcated bus - 3 & 4.
2. Earth Switch - 2 Nos.
3. Bus Bar Protection panel
- PBDCB for the the bifurcated Bus 3 & 4.
4. Modification of existing
Bus bar Protection Scheme Viz. LBB / 96 / CT Inputs / Tripping
of CB.
5. Installation of
Voltmeter, Frequency Meter, Voltage / Frequency Recorder,
Indication Lamps, Fuse failure Relays in Dummy Panels.
6. Cutting & Removal of
Aluminium bus bar of 4' Dia. for both the Bus - 1 & 2 to
create Bus - 3 & 4 during shutdown.
7. Shifting of Jack Bus
Connection - 2 Sets.
8. Laying & Termination of
LT Power & Control Cables.
9. Earthing of Equipments.
This project will improve
the flexibility and reliability of the system operation. We
would like to highlight that the entire site execution done by
us without involving AREVA - Pallavaram, Bangalore, Noida.
Sectionalisation of the bus
is achieved by using the existing "Bus tie" circuit breaker of
"one and half breaker" scheme without introducing new circuit
breaker, isolator, CT's etc.
The above said works were
executed in a live Switchyard with limited Shutdown and having
a power flow of 3000 MW.
M/s. NTPC appreciated our
efforts in executing the project with dedicated team of
Engineers and Technicians without any events of LTI.
The entire modified system
was put into operation on 06/11/07 at 11:30 hrs by
Mr.S.C.Pandy, GM, NTPC - Ramagundm STPS.
|